Three-quarters of Europe’s co-located batteries sit at solar parks, and each market’s rules shape their power rating against the park’s capacity.
We have also looked at the batteries at Europe’s wind farms. The same analysis, drawn from the Aegir Storage Database, compares the power rating of each battery at a solar park with the park’s capacity. The figures are from the database’s snapshot of 12 October 2026, which covers the EU, Britain, Norway and Switzerland.
Germany sizes to a third: Solar parks host 92% of Germany’s co-located batteries. The median battery’s power rating is 0.36 times the park’s capacity, close to the innovation tender’s minimum of a third.
Britain and Greece build to the grid connection: In both markets, where most batteries at solar parks are still in development, the median battery’s power rating matches the park’s capacity. A battery that size can use the park’s export connection in full.
German co-located battery sizing could change if the innovation tender closes. The tender’s minimum matches the German cluster at about a third of the park. Without it, developers may size batteries to match the available grid connection capacity, as many British and Greek pairs appear to.
With the Aegir Storage Database, solar developers can benchmark a battery’s power rating against the park’s capacity by market and screen where a battery could share an existing grid connection. With Aegir Quant™, our institutional-grade financial model, they can also see what a co-located battery adds to a project’s IRR.
Clients can read the full analysis on the platform: Europe’s co-located battery storage by host, market and size
For all of Europe’s co-located batteries, see Europe’s hybrid storage projects, mapped.
Interested in hybrid project data for your solar portfolio?
Reach out to us: www.aegirinsights.com/contact
What share of Europe’s co-located batteries sit at solar parks?
Three-quarters of Europe’s co-located batteries sit at solar parks. In Germany, solar parks host 92% of them.
How big are batteries at German solar parks?
The median battery’s power rating is 0.36 times the park’s capacity, close to the innovation tender’s minimum of a third.
Why do batteries at British and Greek solar parks match the park’s capacity?
A battery with the same power rating as the park can use the park’s export connection in full. In both markets the median battery’s power rating matches the park’s capacity, and most of these batteries are still in development.